Case Studies

Every number comes from field verification and on-site measurement — trusted by leading energy and infrastructure operators.

Field Verified

PetroChina — high-sulfur gas pipeline

Third-party intrusion and leak early-warning on a high-sulfur pipeline — replaced a leading global vendor after a multi-vendor field trial.

100%
DAS recognition accuracy (field test)
Long-haul Pipeline

National operator — China-Myanmar gas line

59.14 km gas spur line; excavator 25 m, farming 5 m, manual 2 m alarm ranges verified.

95%
Effective alarm rate
CCUS

PetroChina — CCUS CO₂ pipeline

First CCUS CO₂ long-haul pipeline third-party intrusion and leak early-warning system.

1st
CCUS CO₂ pipeline application
First-of-kind

Sinopec — high-sulfur pipe-in-pipe

First high-sulfur pipe-in-pipe third-party intrusion and leak early-warning system.

1st
High-sulfur pipe-in-pipe application
Procurement

PetroChina — pipeline fiber sensing

Ranked first in centralized procurement; 32 of 33 alarms verified valid.

≥96%
Effective alarm rate
Infrastructure

Shudao Group — highway tunnel

Structural health monitoring for the largest cross-section highway tunnel.

Largest
Cross-section tunnel monitored

Want to see how it applies to your asset?

Tell us your scenario — we'll share relevant references.

Talk to Us